The total facility covers a total area of 10,000 Sq Metres. The processing plant occupies 3000 Sq metres with plans for an additional 3000 Sq metres extension in 2017. The facility also has an administration building and operates a 16m weighbridge for incoming and outgoing records. The facility is fully equipped to handle and process all of the 50,000 tonnes allowed under the Company’s facility permit. (Link to permit included).
Handling and processing equipment includes the following:
- 16 metre weighbridge
- Volvo loading shovel
- JCB skidsteer
- Fuchs Terex scrap handler
- JCB load all
- Toyota forklift
- Lindner Jupitor 3200 shredder
- 3 x powerscreen trommels
- 2 x Paal balers
- Numerous conveyors and elevators
- 2 x 1kw generators